Ulster Maternity Unit, Dundonald Hospital

Project Description

The brief was to provide a new maternity unit, comprising all of the elements including out patients, delivery suite, theatres, home from home rooms, in patient ward accommodation and SCBU. Prior to the main work commencing several departments required to be decanted, out patients to new purpose built temporary accommodation and SCBU to a refurbished area within the existing main hospital. Close Client interface ensured that all of these enabling works were completed with minimum disruption to patients and staff. Part of the existing unit was to be demolished to facilitate the new building, with a large part of the existing unit remaining live and operational. This required detailed survey, investigation and co-ordination with the Design team and Client to ensure all aspects of this complicated situation were fully addresed. The full range of medical engineering services was included within this scheme.

Similar Posts

  • Jethro Centre, Lurgan for Shankill Parish

    Project Value – £2 million Completed – July 2005 Description Provide new accommodation for Shankill Parish and their Partners. The brief was to provide a new modern building for the Shankill Parish Centre including facilities for their partners including crèche and daycare organisations, on site catering, youth groups, adult learning and multi-purpose halls for productions…

  • Eglantine Presbyterian

    Project Value – £650,000 Completed – November 2008 Description This project involved the refurbishment of the existing church halls and main church sanctuary. As part of this project the works were phased within one contract to allow the church to operate successfully while works were continuing in the other areas. The refurbishment works included new…

  • Newry Convent

    Project Value – £3.5 million Completed – January 2010 Description The project brief was to provide heating, plumbing, ventilation, lighting, power, communication, security systems and kitchen installation to a new convent comprising of 40 bedrooms with en-suites, communal rooms, chapel, kitchen and dining facilities. The heating was to be provided from a central boilerhouse with…

  • David Keir Building at Queens University Belfast

    Project Value – SRIF 2: £4,500,000, SRIF 3 Phase 1: £4,000,000, SRIF 3 Phase 2: £2,000,000 Completed – August 2009 Description This project was split over a number of contracts involving the multi-school refurbishment of the Departments of Chemistry, Chemical Engineering, Civil Engineering, Aeronautical Engineering, Psychology and Agri-food and Land Use. Each department has their…

  • Audi Showroom

    Project Value – £8 million Completed – January 2007 Description These three projects began as one design and build contract for the joint site of the Isaac Agnew showrooms for Audi and Mercedes in Portadown. The brief for this project was to provide each showroom with a two-storey building containing the showroom itself, Customer Services…