|

Ulster Maternity Unit, Dundonald Hospital

Project Description

The brief was to provide a new maternity unit, comprising all of the elements including out patients, delivery suite, theatres, home from home rooms, in patient ward accommodation and SCBU. Prior to the main work commencing several departments required to be decanted, out patients to new purpose built temporary accommodation and SCBU to a refurbished area within the existing main hospital. Close Client interface ensured that all of these enabling works were completed with minimum disruption to patients and staff. Part of the existing unit was to be demolished to facilitate the new building, with a large part of the existing unit remaining live and operational. This required detailed survey, investigation and co-ordination with the Design team and Client to ensure all aspects of this complicated situation were fully addresed. The full range of medical engineering services was included within this scheme.

Similar Posts

  • Antrim RSS/CSA

    Project Value – £2.3 million Completed – April 2006 Description The brief was to provide new accommodation for Clinical Support and Regional Supplies Services, including three Conference/Seminar rooms, two IT suites, eight en-suite on-call bedrooms, on-call living and kitchen areas, 26 offices and four open plan office spaces, with staff rest areas and toilets, as…

  • David Keir Building at Queens University Belfast

    Project Value – SRIF 2: £4,500,000, SRIF 3 Phase 1: £4,000,000, SRIF 3 Phase 2: £2,000,000 Completed – August 2009 Description This project was split over a number of contracts involving the multi-school refurbishment of the Departments of Chemistry, Chemical Engineering, Civil Engineering, Aeronautical Engineering, Psychology and Agri-food and Land Use. Each department has their…

  • PEC at Queens

    Project Value –  £4.7 million Completed – October 2006 Description The brief was to provide a new extension to the Centre for Physical Education suitable for under- and post-graduate levels of study, as well as the provision of physical leisure facilities for students, staff and the general public. The Centre included an exercise fitness suite,…

  • Mid Ulster Sports Complex, Cookstown Borough Council

    Project Value – £1.2 million Completed Description This project for Cookstown Borough Council involved the provision of a totally new indoor training hall with 8 no. changing rooms to compliment the external grass and artificial sports pitches being provided. The sports complex is serviced from a remote energy centre incorporating boiler plant with domestic hot…

  • Newry Convent

    Project Value – £3.5 million Completed – January 2010 Description The project brief was to provide heating, plumbing, ventilation, lighting, power, communication, security systems and kitchen installation to a new convent comprising of 40 bedrooms with en-suites, communal rooms, chapel, kitchen and dining facilities. The heating was to be provided from a central boilerhouse with…

  • Audi Showroom

    Project Value – £8 million Completed – January 2007 Description These three projects began as one design and build contract for the joint site of the Isaac Agnew showrooms for Audi and Mercedes in Portadown. The brief for this project was to provide each showroom with a two-storey building containing the showroom itself, Customer Services…